Packaging Manufacturers Continue Investing in Flexible Automation in 2026

Updated 17 November 2026 with PMMI’s August report and September market update.

When a line runs several products in a shift, ask the supplier to demonstrate the change your operators make most often. A useful test might be a move from a short pouch to a tall one, including the time needed to load the material and produce an acceptable first pack.

What is driving investment in flexible equipment?

PMMI published its 2026 Packaging State of the Industry report on 6 August 2026. The public summary covers machinery retrofits and end-of-line automation. PMMI subsequently reported that manufacturers interviewed for the study cited shorter runs and a wider mix of products and pack formats as reasons to invest in faster changeovers. Read PMMI’s September market update.

How to compare two changeover demonstrations

Measure What to record
Elapsed changeover time Start at the last accepted pack of format A. Stop at the first accepted pack of format B. Record the time required to regain the agreed running rate separately.
Operator work List cleaning, part swaps, material threading and setting changes. Record how many people take part and which tools they use.
Start-up losses Count rejected packs and record material used before production stabilises. Agree in advance how fill and seal quality will be checked.
Output over the shift Divide accepted finished packs by elapsed line hours, including the planned format changes. Use the same sequence and shift length for both proposals.

Include the equipment on either side of the machine

Changing a pouch can affect the filler, bag handling and downstream carton loading. Ask who supplies the change parts at each station and who will demonstrate the handover between machines. For a bagging project, start with the comparison of premade pouches and roll-film VFFS. For controller features or production records, use the automation acceptance questions.

Send suppliers a short run schedule showing the product, pack dimensions, batch size and number of changes in a typical shift. Include a frequent change and the most demanding one. This gives each supplier the same production requirement to quote and demonstrate.